Test Scenarios

ID Scenario Expected result
T01 HDMI endoscopy, HDMI AI input, one monitor, HDMI switch Raw and AI paths converge through the switch
T02 DVI endoscopy, HDMI AI input, HDMI-DVI cable available Mixed-interface cable is used directly
T03 DVI endoscopy, HDMI AI input, no mixed cable, converter available Converter fallback route is generated
T04 SDI endoscopy, HDMI splitter, SDI-HDMI converter SDI is converted before distribution
T05 YPbPr endoscopy, HDMI splitter, component-HDMI converter Component conversion route is generated
T06 Two-monitor configuration AI and raw monitors are routed independently
T07 Gateway with AI source Remaining AI output is allocated to Gateway
T08 Gateway with raw source Raw splitter output is allocated to Gateway
T09 Splitter unavailable Installation-impossible error is displayed
T10 Required cable depleted Failed route is rolled back and another route is tried
T11 No compatible path User receives a clear failure message
T12 Inventory quantity changes Diagram and BOM recalculate without page reload

Production test expansion